2021 Popular downspout and aluminum rain gutter roll forming machine
Product Description
General Information |
Coil Material |
PPGI/PPGL/GI/GL |
Coil Thickness |
0.3~0.8MM |
Coil Width |
--- |
Speed |
12~15M/MIN |
Voltage |
As Customer's Request |
Roll Forming Unit |
Roller Station |
16 |
Driving Motor |
5.5KW |
Shaft Diameter |
70mm Solid |
Shaft Material |
45# Hard Steel |
Roller Material |
45# Hard Steel |
Under Frame |
350H-Beam |
Sidewall Thickness |
16MM |
Transmission |
1 Inch Chain |
Feeding Device |
1 Set |
Cutting Unit |
Cutting Type |
Fly-saw Cutting |
Hydraulic Pump Power |
3KW |
Control Unit |
Control Method |
PLC |
Length Control |
Encoder |
Operation |
Touch Screen |
Language |
Chinese & English |
Auxilliary Device |
--- |
3T Manual Decoiler |
--- |
Exit Rack |
*All parts can be customized as customer's request.
|
Detailed Photos
Certifications
Packaging & Shipping
Company Profile
FAQ
Q1. What are the main key points for selecting right machines?
A1: Whole structure,Roller Shaft,Roller Material,Motor&Pump,and Control system. As the new buyer, please kindly know that price
not the final point.
Good quality is for long-term business cooperation.
Q2. Can you provide OEM service for roll forming machine?
A2: Yes, most of cold roll forming machine need to be customized as detailed request, because raw material , size , production
usage, machine speed, then machine specification will be some different.
Q3. What's your standard trade terms ?
A2: We can provide the technical offer with FOB,CFR,CIF,Door to Door and so on. Please kindly tell the detailed port name for
competitive ocean freight.
Q4. How about the quality control?
A4: Our company adopts 6S system to control every part with passed ISO9001:2000, CE,TUV/BV(Alibaba) Certificate.
Q5. How about the after-sale service?
A5: We provide 18 months free warranty and free technical support for the whole life of any machine. During warranty period, if
parts still broken, we can send the new ones freely.
Q6. If I am in Beijing,Shanghai or Guangzhou,how to visit your company?
A6: 1) Beiing South Statioin to Cangzhou West Station (by fast train 1 hour).
2) Shanghai Hongqiao to Cangzhou West (4.5 hours)
3) Guangzhou Airport to Tianjin ,then Tianjin to Cangzhou West